The 22-week contract encompassed comprehensive external and internal refurbishment across the entire bridge structure. External works included replacement and upgrading of road lighting installations on both bridge approaches, deck-mounted lighting systems, high mast luminaire replacement with associated electrical network upgrades, and installation of intelligent road lighting management systems. Critically, all external works required night-time execution to maintain daytime traffic flow across this vital transport link.
Internal works within the bridge’s box girder structure demanded specialist ATEX Category 2 approved electrical systems suitable for potentially explosive atmospheres. Our scope included removal of six 100mm steel cable conduit pipes, installation of 300mm heavy gauge post-galvanised ladder rack systems, supply and installation of 679 ATEX Cat 2 LED luminaires with integral emergency lighting backup, and installation of 17 internal lighting distribution boards plus 17 street lighting distribution boards.